Limestone retaining wall building company: If you’re building tiered retaining walls, set each tier back far enough to prevent the weight and pressure of the wall above from destroying the one below it. The rule of thumb is to separate wall tiers by a distance that’s no less than twice the height of the wall below. So if the bottom wall is 4 feet tall, the wall above it should be built at least 8 feet behind it. Walls more than 4 feet tall will likely require a building permit and a plan made by a licensed engineer. The engineer will specify the base’s width and depth, how far down the base course should be buried, and whether or not a geogrid (soil reinforcement system) should be used.
Block retaining walls are lightweight, cost-effective, and easy to build. They come in a wider range of styles and colours and are more versatile than concrete sleepers, creating curves and tiered walls can be achieved with ease. Block retaining walls have a wide footprint so if your access is tight or room on your property is at a premium then blocks would not be for you.
We also repair existing retaining walls. Many railroad tie walls or older concrete retaining walls which may or may not include rocks or boulders are beginning to show signs of failure. Often times a homeowner will build a DIY retaining wall that needs help after years of service. Colorado Retaining Wall specializes in the building and repair of retaining walls. Whether the wall is for a backyard or driveway of a residence or a commercial Shopping Center, we design and build large block walls for all Earth retention requirements. We have the ability to fortify the wall with shotcrete or soil nails which would include helical tie-backs or micropiles. Nearly every wall we build requires engineering and we have deep relationships with engineers that work hand-in-hand with our foremen regardless of the size of project. Please read our reviews and look and our photo gallery. Discover more info on Building and repair of retaining walls Colorado.
Good drainage is essential for any retaining wall. Drainage is provided by filling coarse gravel behind the wall and by building weep holes into the wall. Make weep holes by inserting short lengths of 2-inch plastic pipe or 3-inch drain tile in the forms when they are built. The first row should be 2 inches to 4 inches above ground level. If the wall is higher than 4 feet, place a second row of weep holes 3 inches above the first.
After your drainpipe is in place, you should backfill the rest of the space behind the blocks with either sand or pea gravel-either will allow water to filter through to the drainpipe at the base of the wall. For the best results, backfill with a few inches of the material after laying each course of blocks, and use a hand tamper to compact the material. By tamping the backfill every six inches or so, you’ll ensure that it is packed tightly, which will provide additional support from the pressure of the soil behind the wall.